Jul 27 2004

How To Move Heavy Stones

Jody posted this at 8:11 am under reference

The Forgotten Technology:

…many times I had to improvise on tools that were not at hand in order to get the job done.

At one of these times, about 12 years ago, I had to remove some 1200 lb. saw cut concrete blocks from an existing floor. The problem was that we did not have a machine that could reach some of the blocks. The only obvious answer was to break the blocks into smaller pieces with a sledgehammer and load them into a wheelbarrow. To me, this seemed to be too much labor at the time, so I improvised.

He uses no special tools to move massive amounts of stone and concrete:

… working alone [I] could easily move a 2400 lb. block 300 ft. per hour with little effort, and a 10,000 lb. block at 70 ft. per hour. I also stood two 8 ft. 2400 lb. blocks on end and placed another 2400 lb. block on top. This took about two hours per block. I found that one man, working by himself, without the use of wheels, rollers, pulleys, or any type of hoisting equipment could perform the task.

I think he’s going to build some pyramids or something.


2 Responses to “How To Move Heavy Stones”. Leave a Reply.

  1. Penderon 27 Jul 2004 at 8:49 am

    Interesting stuff, I just wish the site wasn’t so shitty and the stupid videos didn’t cost $20.

  2. Steveon 27 Jul 2004 at 10:16 am

    This is one of the most interesting things you have posted. I wish there was more practical info on how to do the stuff he says can be done.

Comments RSS

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Note: This post is over 4 years old. You may want to check later in this blog to see if there is new information relevant to your comment.

By submitting a comment here you grant this site a perpetual license to reproduce your words and name/web site in attribution.